|
3 Hardman Street
Also known as HQ
|
|
|
Images Other Information
- To help fit into the built environment and surrounding masterplan, Sheppard Robson broke the design of 3 Hardman Street into a quartet of stepped sections with the highest one acting as a place-marker for the corner of Hardman Square.
- Vertical fins on the building facade help reduce solar gain whilst lighting controls within are automatic and set themselves according to the level of daylight penetration.
- As a mark of its size, and reflecting the four individual sections it has been designed as, it boasts four separate entrances and four lift cores within the structure. This means it can be split into four individual vertical office villages.
- Adding further flexibility, each floor can also be divided into up to four sections for multi-tenanted space. This allows the key tenant, Barclays to expand and reduce its space beyond the 8,000 square metres of anchor tenancy to accommodate short-term demand.
- Optimising the location of the retail units has seen them placed bounding Crown Square and fitting in with the existing shops. This also helps encourage pedestrian permeability to the north and the key Mancunian street of Deansgate.
- Upon completion in 2009, 3 Hardman Street held the British record for the largest single office building ever speculatively developed outside London.
News Articles
06-06-2014 > 3 Hardman Street Sets New Rent Record Companies
If your company has been involved with the Design/Build, Supply or Maintenance of this building please submit your details. - Architect
- Sheppard Robson
- Developer
- Allied London Properties
- Main Contractor
- Bovis Lend Lease
- Structural Engineer
- Capita Symonds
Reference Data
- Reference No.
- 3872
- First Uploaded
- 19-02-2006
- Last Editorial Date
- 24-10-2011
|
|
- Address
- 3 Hardman Street, Manchester. M3 3HF
- Council
- Manchester City Council
- County
- Greater Manchester
- Region
- North West
- Country
- United Kingdom
View in Google Maps - Status
- Complete
- Proposal date
- 2005
- Construction start date
- 2007
- Completion date
- 2009
- Roof Height (AOD)
- 105.80
- Roof Height (AGL)
- 74.90
- Floor To Ceiling Height
- 3.00
- Total Floors (O.G)
- 15
- Plant Floors
- 1
- Total Floors (U.G)
- 2
- Number of Lifts
- 20
Market Data
- Primary Use
- Office
- Secondary Use
- Retail
- Floorspace (sq m)
- 42,735.00
- Car Parking Spaces
- 250
- Last Sale Value
- £183,500,000.00
- Sale Date
- 2010
Metres > Feet |
|