The structure features precast concrete units 15.24 metres long weighing 9.5 tonnes each that were each made near Leicester and then trucked in for assembly.
The windows from the first floor to the fifth floor are noticeably different from those above. This is a practical measure that allowed them to be installed from the inside without the use of scaffolding.
Companies
If your company has been involved with the Design/Build, Supply or Maintenance of this building please submit your details.