  • Amex House is built on a site which was originally chalk. The foundation hole had to be sunk to a depth of about 16 metres, and 100,000 tonnes of chalk excavated before construction could begin. The foundation consists of 45,000 tonnes of concrete, with 2,000 tonnes of structural steel above ground.
  • The building is described by some as "classic" late modernism with its clean horizontal lines thanks to the layered effect of white glass reinforced plastic panels between each of the levels of floor to ceiling glazing. By employing Glass Reinforced Plastic, Gollins, Melvin and Ward were making the first such use in the United Kingdom of the material.
  • Reducing the profile of the building on the upper level is a recessed top floor. The corners of the building are chamfered reducing the bulk further, whilst the lower three floors are recessed on the southern approach. This combined with the columns framing the entry point creating the impression of a triple height entrance.
  • Following the construction of a new headquarters for American Express in Brighton next door, the building is set to be demolished in 2016 unless it receives listed building status.

Companies

If your company has been involved with the Design/Build, Supply or Maintenance of this building please submit your details.

Architect
Gollins, Melvin and Ward Partnership

Reference Data

Reference No.
4295
First Uploaded
19-02-2006
Last Editorial Date
06-02-2017
 

Building Location

Address
Edward Street, Brighton. BN88 1AH
Council
Brighton and Hove
County
East Sussex
Region
South East
Country
United Kingdom

View in Google Maps

Available office space in BN88

Regus UK Brighton, North Road, BrightonRegus  UK  Brighton

Hova House Office Suites Hova House, Hova Villas, BrightonHova House Office Suites  Hova House

Basepoint Centres Ltd Adur Business Centre, Ropetackle Yard, Shoreham-by-SeaBasepoint Centres Ltd  Adur Business Centre

Find Other Offices

Building Specification

Status
Demolished
Proposal date
1977
Construction start date
1978
Completion date
1980
Demolition Date
2015
Style
Modernist

Roof Height (AGL)
38.00 *

Total Floors (O.G)
9

Market Data

Primary Use
Office

Floorspace (sq m)
28,000.00

Construction Cost
£15,000,000.00
Budget Date
1980

Metres > Feet

* Estimated Height