Find Building

City Tower Also known as 3 Limeharbour and Ability Central

 

Images

Other Information

  • An original taller proposal was shelved, identical in design except for an extra 3 top floors.
  • Although originally penned by Broadway Malyan, BUJ Architects took over this scheme to completion. The scheme was originally developed by Fairview Homes but purchased by the Ability Group.

Companies

If your company has been involved with the Design/Build, Supply or Maintenance of this building please submit your details.

Architect
BUJ Architects
Developer
Ability Group Ltd
Main Contractor
C J O'Shea
Structural Engineer
Clarke Bond Group Ltd

Reference Data

Reference No.
2240
First Uploaded
19-02-2006
Last Editorial Date
08-10-2014
Planning Application Number
PA/02/01917
 

Building Location

Address
3 Limeharbour, Isle of Dogs, London. E14
Council
Tower Hamlets
County
London
Region
London
Country
United Kingdom

View in Google Maps

Building Specification

Status
Complete
Proposal date
2003
Construction start date
2004
Completion date
2006
Style
Post Modern

Roof Height (AGL)
53.00

Total Floors (O.G)
17
Number of Lifts
3

Market Data

Primary Use
Residential
Secondary Use
Retail

Floorspace (sq m)
14,117.00
Flats
232
Car Parking Spaces
86

Metres > Feet